Source-code admin for iGaming operators

Operator admin for players, payments, and multi-brand operations

InGaming Admin is a source-code backoffice for operator teams: player operations, payments, content, permissions, and multi-brand workspace flows. It is built to be integrated with your backend, not to replace it.

Admin access is gated through a short form. Public casino demos show the player-facing side of the broader product scope.

Multi-brand workspace and project navigation in one operator surface.

Projects workspace
Why InGaming

Start from an operator product, not a blank backoffice

The admin already covers the workflows operator teams need, with room for multi-brand setups and custom backend integration.

Skrill
Neteller
Trustly
Adyen
Evolution
Pragmatic Play
Playtech
Red Tiger

Configure content, games and providers

Casino catalogue, provider integrations and payment setup live in the same backoffice workflow.

GGR
AllCasinoSports
$128,450+8.5%
$50K$100K$150KMonTueWedThuFriSatSun

GGR, revenue, deposits and queue work in one flow

Daily metrics, GGR trends and payment review queues live in the same operational layer, so finance and operations teams do not need separate internal tools.

AC

Averil Caccavella

Active

admin@ingaming.dev

$1,250.00

balance

KYC Progress0/3 verified
Passport
Pending
Proof of address
Pending
Bank statement
Pending

Complete player profile. Every section.

KYC, balances, sessions and payment history — all in one screen for support and compliance teams.

Brand card one
Brand card two
Brand card three

Multi-brand workspace

Multiple brands in one workspace — the same foundation can support parallel operator brands without fragmenting tooling.

Core
Operations
Queues, player actions and daily reviews in one place.
Finance
Payments
Deposits, withdrawals and provider-related tasks.
Risk
Compliance
KYC, validation and review workflows.
Growth
CRM & Content
Campaigns, pages and content tools.

Built for operator teams

Operations, payments, compliance and CRM teams work from the same product.

Features

The operator layer is already mapped out

From player KYC to payments and casino operations, the admin already has real product structure and is ready to be adapted to your backend.

Player profile

Player profile

Full player view in one place — identity, KYC, balances, sessions, responsible gambling limits and risk signals.

Project dashboard

Project dashboard

Operational overview for a brand at a glance — revenue, GGR, registrations, active players and the metrics teams watch every day.

Casino management

Casino management

Manage providers, browse game libraries, track casino rounds and control game groups in one place.

Payments

Payments

Full transaction monitoring across providers and payment methods. Drill into player-level payment history, manage withdrawal approvals, and see provider-level breakdowns without leaving the admin.

Team & access control

Team & access control

Members, roles and fine-grained permissions across every team type — operators, support, risk, finance. Add people, assign roles, and manage what each person can see and do across the whole workspace.

Commercial model

License the codebase and product work

One-time source code license. You receive the codebase, UI architecture, and demo setup, then adapt and connect the product to your own backend and operating model.

Player-facing product layer

Casino frontend

$5,000

Two branded casino directions, lobby structure, mobile layouts, reusable UI patterns, and a serious frontend template for a custom operator build.

Plan scope
  • Two branded site directions
  • Lobby and core page structure
  • Responsive frontend and mobile layouts
  • Source code for adaptation to your brand and backend
Backoffice product layer

Operator admin

$12,000

A source-code admin for players, KYC, payments, content, permissions, and day-to-day operator workflows. Designed for custom backend integration.

Plan scope
  • Players, KYC, payments, content, and permissions surfaces
  • Operator workflow UX and product structure
  • FSD architecture with reusable product patterns
  • Source code for backend connection and internal extension
Admin + casino frontend

Full package

from $16,000

The complete source-code scope: operator admin plus casino frontend, licensed together for teams building a serious iGaming product.

Plan scope
  • Both codebases under one commercial scope
  • Shared product work for operator and player-facing sides
  • Faster alignment between brand, ops, and product teams
  • Best-value entry point if you need both sides of the product

Review license terms before purchase. Product and technical discussions can stay asynchronous. Need a custom scope? Contact us.

FAQ

Frequently asked questions

Questions specifically about the operator admin product and access model.

Interested in the admin product?

Request admin access to review the backoffice product in detail. Casino frontend demos can stay public, but the admin surface is the part worth gating.

Review the admin first. Discuss scope second.